DEG Estimating Tips2021-03-01T16:47:10-05:00

DEG Estimating Tips

DEG Estimating Tips

Estimating Tip – Mitchell – Transferring fender mounting bracket

April 22nd, 2024|Comments Off on Estimating Tip – Mitchell – Transferring fender mounting bracket

Estimating Tip – Mitchell – Transferring fender mounting bracket Recent DEG inquiry 36465 provides response from Mitchell regarding transferring fender mounting brackets. “Please see Labor General Information: Additions to Labor Times. Transfer Time: For welded, riveted or bonded brackets, braces or reinforcements from old part to new part. Suggest user estimate on site time needed for repairs.”

Estimating Tip: Mitchell – Carpet/ insulation Pull Back vs Full R&I

April 18th, 2021|DEG Estimating Tips|

Mitchell Collision Estimating Guide (CEG) replacement procedures may include “loosen and pullback carpet and/or insulation as required” as part of the welded panel replacement operation. [...]

Estimating Tip: CCC, Mitchell and Audatex- Additional preparation stone guard & textured areas

March 21st, 2021|DEG Estimating Tips|

Some vehicles may come from the OEM with chip guard/ stone guard applied to the rocker areas under the painted areas. There may be instances [...]

Estimating Tip: Audatex- Prime and Block Not included for non-exposed inner structure panels

March 14th, 2021|DEG Estimating Tips|

DEG Inquiry 17915 Response from Audatex “Prime and Block operations are only included for exposed welds on exterior panels.” An Example would be replacing inner [...]

Estimating Tip: CCC, Mitchell and Audatex- OEM required safety inspections

March 7th, 2021|DEG Estimating Tips|

OEM specific safety inspections may be a required procedure, and are NOT INCLUDED in all three estimating system published labor times. Examples of “Safety Inspection” [...]

Go to Top