DEG Estimating Tips2021-03-01T16:47:10-05:00

DEG Estimating Tips

DEG Estimating Tips

Estimating Tip – CCC – Flash & Wait Time

December 18th, 2023|Comments Off on Estimating Tip – CCC – Flash & Wait Time

CCC/MOTOR Guides have updated "Basic Color Coat Application" Not Included operation "Flash/wait time between material applications" Flash and Cure consideration would be an "On the Spot Evaluation"

All Three Estimating Systems – Secondary Color / E-Coat Color Duplication

November 5th, 2018|DEG Estimating Tips|

Refinish labor to duplicate factory “E-coat”/Overspray appearance on non-visible back side/undersides is NOT INCLUDED. Refinish times also does not include color matching, mixing the appropriate [...]

CCC, Audatex & Mitchell – Quick Reference Chart Pre/Post Scan Included/Not Included Labor Options

October 22nd, 2018|DEG Estimating Tips|

The DEG has developed a quick reference chart of included/not included labor operations on repairs requiring pre/post scan,initializing and calibration. To download this chart, click [...]

CCC, Audatex & Mitchell- Quick Reference of Repair Conditions Involving Seam Sealers and Protective Coatings for Welded Panel Labor

October 15th, 2018|DEG Estimating Tips|

The DEG has developed a quick reference chart of Included and not Included labor operations when working with repairs involving the following conditions. To download [...]

CCC, Audatex, and Mitchell – Disassembly of Replacement Parts for Refinish

September 17th, 2018|DEG Estimating Tips|

Some replacement parts may come preassembled from the supplier in primer or with incorrect supplied body color. Labor to disassemble replacement parts i.e. grilles, mirrors, [...]

Go to Top