Estimating Tip: Mitchell – Carpet/ insulation Pull Back vs Full R&I

Mitchell Collision Estimating Guide (CEG) replacement procedures may include “loosen and pullback carpet and/or insulation as required” as part of the welded panel replacement operation. Recent DEG Inquiry 18042 states “pull back the carpet is [...]

2021-04-15T16:26:13-04:00April 18th, 2021|DEG Estimating Tips|

Estimating Tip: CCC- Manual adjustments for section operations

CCC/MOTOR GTE (P Pages) Special Precautions > Sectioning  “Some sectioning operations are not subject to Overlap Operations listed in the Headnotes of varying component groups. Adjacent components factored into Overlap Operation considerations may not apply [...]

2021-04-08T15:07:12-04:00April 11th, 2021|DEG Estimating Tips|

Estimating Tip: CCC- Door w ’strips on body r/I NOT INCLUDED.

When R&I of headliner is performed, CCC/MOTOR the GTE states “Weatherstrip D&R” (Disconnect & Reconnect) is included. “Weatherstrip R&I” (Remove & Install) is NOT INCLUDED. CCC users should note the difference between the D&R vs [...]

2021-04-05T09:34:10-04:00April 5th, 2021|DEG Estimating Tips|

Estimating Tip: Audatex Estimating “QAPTER” > Database Search Function

Audatex users that have recently updated to the newer version on Qapter estimating will come across a new look and feel of the entire estimating system from Audatex. Some enhancements made from ADXE is the [...]

2021-03-26T10:37:39-04:00March 28th, 2021|DEG Estimating Tips|

Estimating Tip: CCC, Mitchell and Audatex- Additional preparation stone guard & textured areas

Some vehicles may come from the OEM with chip guard/ stone guard applied to the rocker areas under the painted areas. There may be instances where a repair may only need to refinish or blend [...]

2021-03-19T09:27:33-04:00March 21st, 2021|DEG Estimating Tips|

Estimating Tip: Audatex- Prime and Block Not included for non-exposed inner structure panels

DEG Inquiry 17915 Response from Audatex “Prime and Block operations are only included for exposed welds on exterior panels.” An Example would be replacing inner structure items or frame rail sections. Audatex users may find [...]

2021-03-12T14:02:07-05:00March 14th, 2021|DEG Estimating Tips|

Estimating Tip: CCC, Mitchell and Audatex- OEM required safety inspections

OEM specific safety inspections may be a required procedure, and are NOT INCLUDED in all three estimating system published labor times. Examples of “Safety Inspection” operations that cannot be verified by scanning could be: • [...]

2021-03-05T13:59:53-05:00March 7th, 2021|DEG Estimating Tips|

Estimating Tip: CCC/MITCHELL: Wheel R/I not included in Bumper labor times

CCC and Mitchell have confirmed that Labor to R/I wheels to gain access to bumper removal is NOT INCLUDED. Its important to always reference the specific vehicle chapter footnotes to verify if any specific operations [...]

2021-03-01T09:23:06-05:00March 1st, 2021|DEG Estimating Tips|