DEG Estimating Tips2021-03-01T16:47:10-05:00

DEG Estimating Tips

DEG Estimating Tips

Estimating Tip – Solera Qapter (Audatex) – section 4-2 labor exclusion update

February 26th, 2024|Comments Off on Estimating Tip – Solera Qapter (Audatex) – section 4-2 labor exclusion update

Recent Updates in Solera Qapter DBRM page 44 section 4-2 labor exclusions: "Additional required operations that are taught in an OEM training environment but aren’t included in the current OEM reference material. " Repair planners should always refer to OEM procedures as well as the OEM-trained technician on required steps that must be performed not detailed in OEM workshop instructions.

Estimating Tip: CCC, Mitchell and Audatex- Duplicate R/I and or Fitting operations

November 16th, 2020|DEG Estimating Tips|

Some labor operations in all three estimating systems may included operations which are only accounted for 1 time to be done in the labor operation. [...]

Estimating Tip: CCC, Mitchell and Audatex: Rivnut, Rivstud, Nutsert and misc Attachment Hardware.

September 28th, 2020|DEG Estimating Tips|

Some replacement panels may require additional mounting hardware for attached components. The labor and hardware cost to install these misc. fasteners to the replaced panel [...]

Go to Top