Audatex – Not Included Drain, Refill and Bleed Operations

Audatex DBRM 4-2 Labor exclusions state the following are NOT INCLUDED considerations in labor time development: • Drain, refill and/or top off engine oil. • Drain or refill fuel tank. • Drain, refill and/or top [...]

2018-05-07T16:07:40-04:00May 7th, 2018|DEG Estimating Tips|

All Three Estimating Systems – ASA Not Included Quick Reference Chart

ASA (Automotive Service Association) maintains and updates the Quick Reference Chart of “Not-Included” Operations When Installing New Replacement Parts. Anyone can view and save this document by clicking the link here. This chart gives users [...]

2018-04-18T12:19:22-04:00April 16th, 2018|DEG Estimating Tips|

All Three Estimating Systems – NON OEM parts with Badges and Emblems

It’s important to note when selecting NON OEM parts with an emblem or badge attached (i.e. Grille’s, Finish panel moldings) in the estimating system, OEM emblems and badges may not come with the NON OEM [...]

2018-04-10T10:05:28-04:00April 9th, 2018|DEG Estimating Tips|

CCC – Labor for Cooling Fan Components NOT Included in Radiator Labor Times

Recent DEG Inquiry 11920 discovered a CCC error in the system which will require users to perform manual entry to allocate correct labor times. Radiator replacement time includes to R/I cooling fan shroud as an [...]

2018-04-10T09:55:23-04:00April 2nd, 2018|DEG Estimating Tips|

Mitchell – Quarter Panel Replacement, Additional Labor for Urethane Set Glass

When performing quarter panel replacement, the labor procedure does not include allowances for necessary precautionary measures to remove undamaged urethane set glass, nor clean-up of the old adhesive on the glass. If the existing urethane set glass [...]

2018-03-27T13:16:07-04:00March 26th, 2018|DEG Estimating Tips|
Go to Top