CCC/MOTOR GTE (P Pages) Special Precautions > Sectioning  “Some sectioning operations are not subject to Overlap Operations listed in the Headnotes of varying component groups. Adjacent components factored into Overlap Operation considerations may not apply due to the sectioning approach being implemented. Overlap deductions should be determined after an on-the-spot evaluation once section approach has been determined.”

An example of this scenario can be found in DEG Inquiry 17983, to which CCC responded: “When sectioning the LOCK PILLAR (Cab Corner) and Replacing the roof panel, the system is deducting -6.0 hrs. H notes only indicate 6 hr. deduction is when R/R aperture panel FULL Panel and not the section of the “LOCK PILLAR”