Recent DEG Inquiry 17032

“Estimated Release Date: Closed

Proposed Resolution: MOTOR stated:
After review of the procedural steps for “Set Back Box Assembly” vs “R&I Box Assembly” the same procedural steps are required for both operations. For this vehicle it was determined that “Set Back Box Assembly” requires the same estimated work time as “R&I Box Assembly” there for the operation “Set Back Box Assembly” was deleted.

Please note:
“Set Back Box Assembly” does not create adequate work space for refinishing operations.”

For more information about SCRS, or to join as a member, please visit
www.scrs.com, call toll free 1-877-841-0660 or email us at info@scrs.com.