Additional NOT INCLUDED labor operations can be quickly added from the “Additional labor Operations” prompt in Audatex. An example would be when replacing a lower control arm that would require engine R&I as per the OEM repair instructions.

Always reference OEM repair instructions and estimating system footnotes / added labor prompts to see what additional entries may be needed.

For more information about SCRS, or to join as a member, please visit www.scrs.com, call toll free 1-877-841-0660 or email us at info@scrs.com.