DEG Estimating Tips2021-03-01T16:47:10-05:00

DEG Estimating Tips

DEG Estimating Tips

Estimating Tip – All Three – Solvent Testing Replacement Parts

February 2nd, 2026|Comments Off on Estimating Tip – All Three – Solvent Testing Replacement Parts

Replacement parts may require solvent compatibility testing prior to refinishing to ensure your products don’t react with factory coatings. Labor and materials to test, strip, and restore the substrate to a "new" condition are NOT INCLUDED in all three estimating systems (CCC, Mitchell & Solera Qapter).For example, the Ford F-150 upper bumper cover shown here failed solvent testing; it now requires stripping and treatment as a raw plastic part. Please [...]

Estimating Tip – Solera Qapter (Audatex) – Roof & Bed Underside Refinish NOT INCLUDED

January 13th, 2025|DEG Estimating Tips|

Solera Qapter DBRM page 145 section 4-4 Refinish Guideline states "Audatex does not include refinish labor for roof or bed underside."

Estimating Tip – Solera Qapter (Audatex) – Masking Interior surfaces and Jambs

December 9th, 2024|DEG Estimating Tips|

DBRM Section 5-2 FAQ: Question:  When you are refinishing an exterior sheetmetal panel, is the time to mask the gap opening between the adjacent panels included [...]

Estimating Tip – Solera Qapter (Audatex) – Seam Sealer Application for Door Skin

October 14th, 2024|DEG Estimating Tips|

Per Audatex DBRM https://degweb.org/wp-content/uploads/2023/12/ADXE_DBRM_Nov_2023.pdf Section 4-3 Outer Panel replacement only includes labor to seam seal on the perimeter flange to create a water tight seal. If [...]

Go to Top