Estimating Tip – CCC – R&I Headlights does not include Aim Lights

March 17th, 2025|Comments Off on Estimating Tip – CCC – R&I Headlights does not include Aim Lights

Recent DEG Inquiry 38543 features feedback from MOTOR that establishes "anytime the headlamp assembly is removed from the vehicle the ’Aim Headlamps’ operation should be performed and added to the estimate."Additionally, in DEG Inquiry 37473 MOTOR states: "The estimated work time for ’Headlamp Aim’ does not include the following. Component part replacement. Inspect vehicle for damage. Verify Oil level. Verify Coolant level. Verify Tire Pressure. Verify Trunk & Vehicle cargo removal. Load "Appropriate Weight" [...]

Estimating Tip – Solera Qapter (Audatex) – Roof & Bed Underside Refinish NOT INCLUDED

January 13th, 2025|DEG Estimating Tips|

Solera Qapter DBRM page 145 section 4-4 Refinish Guideline states "Audatex does not include refinish labor for roof or bed underside."

Estimating Tip – Solera Qapter (Audatex) – Masking Interior surfaces and Jambs

December 9th, 2024|DEG Estimating Tips|

DBRM Section 5-2 FAQ: Question:  When you are refinishing an exterior sheetmetal panel, is the time to mask the gap opening between the adjacent panels included [...]

Estimating Tip – Solera Qapter (Audatex) – Seam Sealer Application for Door Skin

October 14th, 2024|DEG Estimating Tips|

Per Audatex DBRM https://degweb.org/wp-content/uploads/2023/12/ADXE_DBRM_Nov_2023.pdf Section 4-3 Outer Panel replacement only includes labor to seam seal on the perimeter flange to create a water tight seal. If [...]