Recent Updates in Solera Qapter DBRM page 44 section 4-2 labor exclusions:
“Additional required operations that are taught in an OEM training environment but aren’t included in the current OEM reference material. ”
Repair planners should always refer to OEM procedures as well as the OEM-trained technician on required steps that must be performed not detailed in OEM workshop instructions.