DEG Estimating Tips2021-03-01T16:47:10-05:00

DEG Estimating Tips

DEG Estimating Tips

Estimating Tip – Mitchell – Matte Clear Coat

March 9th, 2026|Comments Off on Estimating Tip – Mitchell – Matte Clear Coat

DEG Inquiry 23038 confirms operations outside of normal gloss clear coat steps are NOT INCLUDED: "The Matte Clear application process may vary by paint manufacturer, and situations can exist where the application requires additional steps outside the procedure inclusions. Commonly, performing spray-out cards or "let-down" panels for matching a matte sheen or finish may be necessary. When conditions arise outside the procedure inclusions, additional considerations should be handled on a [...]

Estimating Tip – Solera Qapter (Audatex) – Additional Labor Operations

February 9th, 2026|DEG Estimating Tips|

When performing R&R (Remove and Replace) or R&I (Remove and Install) procedures in Solera Qapter, users can quickly include necessary "Additional Labor Operations" directly during [...]

Estimating Tip – Solera Qapter (Audatex) – Chip Guard Application

December 15th, 2025|DEG Estimating Tips|

Solera Qapter users can reference information about Chipguard application in Solera DBRM page 139 section 4-4 Refinish Guidelines "The application of chipguard material to the lower [...]

Go to Top